Highmark Stadium | Resinous Flooring Installation
As part of one of the largest construction projects in Western New York's history, GP Flooring Solutions was proud to complete the resinous flooring installation at the new Highmark Stadium, home of the Buffalo Bills. Spanning approximately 120,000 square feet, the project presented an opportunity for our team to contribute to a landmark that will serve the Western New York community for generations.
Our scope included approximately 41,000 square feet of Cryl-A-Chip SL, 79,000 square feet of Cryl-A-Flor SL, and 27,000 linear feet of integral MMA cove base throughout multiple concourse levels, including the Field, 100, and 300 levels.
Overcoming the Elements
Mobilizing in the spring of 2025 and reaching substantial completion on June 1, 2026, our team faced an especially demanding set of conditions. Much of the installation took place during one of the harshest winters in a decade, with temperatures dropping as low as 21°F. Constantly shifting construction schedules, changing site conditions, and weather delays required our crews to remain flexible and ready to move between work areas as the project progressed.
To meet these challenges, GP Flooring Solutions utilized fast-curing Methyl Methacrylate (MMA) resinous flooring systems, which can achieve a full cure in as little as one hour, even in sub-freezing temperatures. Custom containment structures and specialized ventilation equipment were also implemented to support safe and efficient installation in challenging conditions.
At peak mobilization, our on-site team grew to 25 personnel, working across multiple concourse levels while coordinating daily with more than 25 field superintendents. When unexpected substrate issues arose, our team also applied its concrete restoration expertise to help keep the project moving forward without compromising quality.
Collaboration at Every Level
A project of this scale required constant communication and coordination. Working closely with Gilbane-Turner leadership, design firm Populous, and the many trades working throughout the stadium, our team navigated evolving schedules, additional scope, and complex field conditions.
Given the specialized chemistries involved in the installation, we also partnered with an industrial hygienist to establish comprehensive containment and airflow protocols. These measures helped protect air quality for our crew and the other trades working in adjacent spaces.
From the initial mobilization through final installation, the project's success was a result of teamwork at every level, from our field crews and project management team to the general contractor and fellow trades.
A Piece of Western New York History
The new Highmark Stadium represents a significant investment in Western New York and a landmark for the community. Seeing the finished resinous flooring in place as Bills fans filled the stadium for the home opener was a rewarding moment for everyone involved.
For GP Flooring Solutions, this project was about more than installing floors. It was an opportunity to put our expertise, adaptability, and craftsmanship to work on a facility that will create memories for generations of Bills fans.
As our Lead Project Manager reflected:
"The new stadium became my second home, and seeing what our crew pulled off under those extreme conditions was incredible. This was a total team victory—from the field to the office—and I’m immensely proud to be part of something bigger than ourselves and to help shape a piece of Western New York history."
Project Details
Project: New Highmark Stadium
Location: Orchard Park, NY
Client/Facility: Buffalo Bills
General Contractor: Gilbane-Turner
Design Firm: Populous
Scope: MMA Resinous Flooring Installation
Materials: Cryl-A-Chip SL and Cryl-A-Flor SL
Flooring Installation: Approximately 120,000 square feet
Integral Cove Base: 27,000 linear feet
Project Timeline: Spring 2025 – June 2026